Project
TEİAŞ – Transforming Power Transmission System Project (TPTS)
TürkiyeElectricity Transmission, Grid Infrastructure, Renewable Energy Integration
World Bank-financed upgrade of TEİAŞ's 400 kV and 154 kV transmission grid. It covers new and modernised substations, lines and underground cables to unlock about 1.7 GW of renewable capacity, SCADA/energy-management digitalisation, and technical assistance on HVDC corridors. Approved on 4 August 2025 as Phase 7 of the World Bank ECARES programme, and described as the first phase of a wider US$1.5bn package.
Status
ImplementationStatus
Overview
- Location
- National transmission grid, Türkiye
- Delivery Model
- Public utility investment by the transmission system operator
- Financing
- EUR 625m IBRD loan, EUR 32.8m Clean Technology Fund loan and US$2m CTF grant
Project Developments
- Project · 4 August 2025World Bank approves TEİAŞ Transforming Power Transmission System Project
The World Bank approved €625m of IBRD financing plus Clean Technology Fund support for TEİAŞ's Transforming Power Transmission System Project on 4 August 2025. The project upgrades 400 kV and 154 kV grid assets to integrate about 1.7 GW of renewable capacity and digitalises grid management.
Participants & Roles
Utility / Network Operator
- Turkish Electricity Transmission Corporation (TEİAŞ)Transmission system operator; borrower and implementing agency
Lender / Financier
- World Bank (IBRD)EUR 625m IBRD loan plus Clean Technology Fund financing