TEİAŞ – Transforming Power Transmission System Project (TPTS)

TürkiyeElectricity Transmission, Grid Infrastructure, Renewable Energy IntegrationReviewed 1 October 2026

World Bank-financed upgrade of TEİAŞ's 400 kV and 154 kV transmission grid. It covers new and modernised substations, lines and underground cables to unlock about 1.7 GW of renewable capacity, SCADA/energy-management digitalisation, and technical assistance on HVDC corridors. Approved on 4 August 2025 as Phase 7 of the World Bank ECARES programme, and described as the first phase of a wider US$1.5bn package.

Status

ImplementationStatus

Overview

Location
National transmission grid, Türkiye
Delivery Model
Public utility investment by the transmission system operator
Financing
EUR 625m IBRD loan, EUR 32.8m Clean Technology Fund loan and US$2m CTF grant